TEST AND INSPECTION PER: 01-SAMSS-042 , API 15HR , API 15LR and Specifications As Noted Below
RTR PIPES & FITTINGS: For Water and Hydrocarbons | INSPECTION & TESTING
Pre-Fabrication/Production Requirements |
Specification Details / Notes: |
| Pre Inspection Meeting | |
| Inspection and test plan | |
| Raw Material certificates | Per 01-SAMSS-042. |
In process inspection & test requirement |
Specification Details / Notes: |
| Pipe Joints | Per 01-SAMSS-042 |
| Short term Hydrostatic failure test | Per ASTM D1599 |
| External Pressure Resistance | Per ASTM D2924 |
| Longitudinal Tensile Test | Per ASTM D2105 |
| Ring stiffness and Ovality limit | Per ASTM D2410 |
| Hydrostatic design stress | Per ASTM D2992 |
| DSC cure verification | Per 01-SAMSS-042 |
| UV protection | Per 01-SAMSS-042 |
Final inspection & test requirements |
Specification Details / Notes: |
| Visual and Dimension check | Per 01-SAMSS-042 & Appendix D |
| Hydro test | Per 01-SAMSS-042 |
| Glass content | Per ASTM D2584 |
| Marking and labeling | Per 01-SAMSS-042 |
| Final Material certificates/ documentation | API 15HR/LR and 01-SAMSS-042 |
| Packing and preparation for shipment | Per 01-SAMSS-042 |
| API Monogrammed | Per 01-SAMSS-042 |
Notes:
- May only be waived by the responsible Saudi Aramco, ASC, or AOC Inspection
- See form SA175 – 000003 for instructions on using this


