HVAC QC Inspector Interview Questions (Specially for Aramco CBT)

This article is about HVAC QC Inspector Interview Questions designed for ARAMCO projects in Saudi Arabia. Now a days Aramco CBT Test for QCs is conducted before posting to sites. These HVAC Questions will be helpful for HVAC engineers and QCs. All answers are given below at the end of page.

HVAC QC Inspector Interview Questions

  1. What is VFD? (WHAT IS VFD AND ITS PRINCIPLE, WHY VFD IS USED)

a.    Vent Floor Drain             b.    Ventilator Fixing Diagram c.    Variable frequency drive                                d.    Valued frequency drive e.    None of the above

2. What is the device arranged to seal-off airflow automatically through a part of an air duct system so as to restrict the passage of smoke?

a.    Fire Damper   b.  Volume Damper c.  Back draft Damper     d.    Smoke damper e.    None of the above

3. When does a rectangular elbow of low velocity duct system do not require to have vanes?

a.    If throat radius is equal to duct width                         b.    Throat radius is greater than width of the duct c.    Throat radius is less than width of the duct               d.    Throat radius is twice the width of the duct

e.    None of the above

4. A non-woven geo textile with a unit weight of at least of…………..

a.    100 g/m     b.    120 g/m c.    90 g/m       d.    140 g/m e.    None of the above

5          The surface slope to catch basin shall be not less than of………… %

a.    2∙5%                                                                                   b.    1∙5%

c.    1∙0%                                                                                   d.    2∙00% e.    None of the above

6. Plastics pipe shall be supported at each story or a minimum interval of……..

a.10ftb.6ft
c.   8ft   d.2m
e. None of the above

7. Which type of joints is approved for cpvc pipes?

a.Mechanical jointsb.Solvent cemented joints
c.   Welded joints   d.Brazed joints
e. A & B

8. For approval of leak test for Sewer line above the ground shall be watertight for a period of

a.    1 hour                                                                                b.    4 hours

c.    12 hours                                                                            d.     24 hours e.    48 hours

9. Unless otherwise specified steel sheet and strip used for duct and connectors have the Minimum yield strength of…….

a.28,000 psib.40,000 psi
c. 35,000 psi   d.30,000 psi
  e. None of the above

10. Up to 120 in. (3048 mm) width ties shall be spaced at even intervals of duct width not exceeding

a.    1254 mm          b.    1524 mm c.       1542 mm     d.    1624 mm e.    None of the above

11. Which are automatically shut down in the event of a fire or for air transfer openings in walls or partitions

a.Fire Wallb.Fire dampers
c.   e.Draft Stop   None of the aboved.Heat Stop

12. Dampers can be installed in exhaust duct systems

a.TRUE,b.FALSE,
c.   None of the aboved.0

13. Where lead flashing material is used, it shall be a minimum of …..

a.    two (2) pounds per square foot                                    b.    four (4) pounds per square foot

c.    six (6) pounds per square foot                                      d.    three (3) pounds per square foot

e.    None of the above

14. Solvent cement and primer for thermoplastic piping shall be stored temperature of……. %

a.    25∙70%                                                                               b.    26∙70%

c.    27∙70%                                                                               d.    28∙70%

e.    None of the above

15. PVC pipe and fittings shall be used for cold water distribution systems outside the building shall be not used for water above of…………

a.80Cb.48.8C
c.   92C  d.110C
e. None of the above

16. Cpvc pipes and fittings are used for

a.Cold water system out side the buildingb.Only for hot water system
c.   For both hot and cold water system d.Not permitted for use
e. cold water system inside the building

17. The maximum force required to open a stair door under maxi- mum stair pressure conditions should be limited to …

a.80 lbfb.20 lbf
c.   30 lbf   d.40 lbf
e. None of the above

HVAC QC Inspector Interview Questions (Specially for Aramco CBT)

18. Grills are only 2way and 4way type ???

a.FALSE,b.TRUE,
c. None of the aboved.0

19. What is the part on the refrigeration system that is designed to liquefy refrigerant vapour by the removal of heat??

a.Expansion Valveb.Compressor
c.  Condenser   d.Evaporator
e. None of the above

20. What is a full-radius or long sweep elbow?

a.Inside radius is less than width of the ductb.Inside radius is greater than width of the duct
c.   Inside radius is equal to the width of the duct d.Inside radius is twice the width of the duct
e.  None of the above

21. Gasket, O-Rings and lacking keys be stored flat on racks below of………….

a.    32C                                                                                     b.    38C

c.    35C                                                                                     d.    23C

e.    None of the above

22.  The maximum drove of catch basin from high point of paving shall be……..

a.200mmb.250mm
c.   150mm   d.300mm
e. None of the above

23. Fasteners used on steel duct shall be ………………….

a.    COPPER                                                                              b.    STEEL

c.    ALUMINIUM                                                                     d.    GALVANIZED

e.    None of the above

24. Ducts with interior widths of …………. or less do not require mechanical fasteners in addition to adhesive

a. 453mm b.    303mm c. 203mm          d.    243mm e.    None of the above

25. Hot and cold water supply it shall be tested under pressure of………

a. 150psi           b.    180psi c. 150bar         d.    158psi e.    None of the above

26. A device or means to prevent backflow into the potable water system.

a.Back flow connectionb.Backflow preventer
c.   back-pressure backflow   d.back-siphon age
e. None of the above

27. For approval of leak test for Sewer line that had been backfilled shall be watertight for a period of

a.    1 hour                 b.    4 hours c.    12 hours             d.     24 hours e.    48 hours

28. A continuous membrane used to subdi- vide a concealed space to restrict the passage of smoke, heat, and flames

a.    Draft Stop                                 b.    Area Separation Wall

c.    Fire wall                                     d.    Fire Stoper

e.    None of the above

29. Duct systems can be interconnected with any other building ventilation or exhaust system

a.    TRUE               b.    FALSE c.    None of the above                        d.    0

e.

30. Lead bends and lead traps shall not be less than ………….. wall thickness

a.    3.2mm                                                                               b.    4mm

c.    6mm                                                                                   d.    2.5mm

e.    None of the above

31. Pipe stored on racks or bearing board the support will be at least ……………

a.    75mm Wide             b.    90mm Wide c.  100mm Wide                  d.    60mm Wide

e.    None of the above

32. The minimum height of hanger width for plastic pipe shall be …………

a.    50mm                                                                                 b.    75mm

c.    60mm                                                                                 d.    100mm

e.    None of the above

33. What should be the height of header from where water will be filled for drainage leak test?

a.    3m        b.    4m c.  3.5m d.    2m e.    None of the above

34. In a smoke control system acceptance testing, which one is most important

a.    Component testing           b.    Functional testing c.  Performance testing                                                      d.    Documentation e.    All above

35. Bends shall be made with not less than ……………. centerline radius

a.    two duct diameter                                                           b.    one duct diameter

c.    half duct diameter                                                           d.    one and half duct diameter e.

36. Flexible duct shall be supported at the manufacturer’s recommended intervals but at least every ………..

a.    5.5 ft                                   b.    5 ft c.    3 ft                                                                                      d.    4ft e.    None of the above

37. Butterfly damper is a fire damper.

a.TRUE,b.FALSE,
c.   None of the aboved.0

38. What Is The meaning of  FAHU?

a.Fresh Air Handling Unitb.First Air Handling Unit
c.   Front Air Handling Unitd.None of the above

39. When does a rectangular radius elbow do not require to have turning vanes?

a.    Throat radius is 1-1/2 the duct width                          b.    Gaiter line radius is 1-1/2 the duct width c.       Outside radius is l-l/2 the duct width                           d.    None of the above

40. Solvent cement and primer for thermoplastic piping shall be stored temperature of…….

a.    25∙70%                                                                               b.    26∙70%

c.    27∙70%                                                                               d.    28∙70%

e.    None of the above

41. The minimum surface travel of any liquid to a catch basin should not greater than……

a.    10 meter              b.    18 meter c.    15 meter                         d.    16 meter

e.    None of the above

42. The minimum spacing between drainage inlets should not exceed……….

a.    120m          b.    90m c.       80m                    d.    50m

e.    None of the above

43. Trap used in pressurized building as described shall have minimum trap seal of….

a.    110mm                 b.    120mm c.       90mm           d.    150mm

e.    None of the above

44. Valve which is installed for controlling all outlets at discharge side of water meter is

a.    Shut off valve       b.  Isolating valve c.   Pressure regulating valve                                              d.    Full way valve e.    Solenoid valve

45. A wall of fire-rated construction which serves to divide the floor area of a building into acceptable area limits

a.    Fire wall              b.    Area Separation Wall c.       Divider wall                                                                       d.   Breaker Wall e.    None of the above

46. Ducts shall not pass through firewalls or fire partitions

a.  TRUE,                                                                                 b.  FALSE

c.  Partially                                                                               d.  None of the above e.

47. Metal drain pans shall be of ………. coated galvanized steel

a.G−110b.G−98
c.   G−90   d.G−120
e. None of the above

48. Leakage test pressure should be exceed duct pressure class level

a.    TRUE                                                                                   b.    FALSE

c.    None of the above                                                            d.    0

49. Water closet shall have an average consumption of not more than……………..of water per flush

a.    6.1 liters                                b.    4.5liters c.    6.0 liters                                                                            d.    5.5 liters e.    None of the above

50. What is the appliance receiving, conditioning and delivering air supplied through an air distribution system?

a.    Fan Coil Unit           b.    Air Terminal Unit c.   Air filter                                 d.    Air Foil

Answers:

1C
2D
3A
4A
5B
6A
7B
8B
9D
10B
11B
12B
13B
14B
15B
16C
17C
18A
19C
20A
21B
22A
23B
24C
25A
26B
27D
28A
29B
30A
31A
32A
33A
34E
35B
36B
37A
38A
39B
40B
41C
42B
43A
44D
45B
46A
47C
48B
49A
50B