TRAP, SCRAPER: Permanent Scraper Traps | Water or Hydrocarbon Services, Onshore and Offshore

TEST AND INSPECTION PER: 02-SAMSS-009 and Specifications As Noted Below.

TRAP, SCRAPER: Permanent Scraper Traps for Line Sizes above 4″, for Pressure Ratings of Class 150 to 1500. Applies to Water or Hydrocarbon Services, Onshore and Offshore

Pre-Fabrication/Production Requirements

Specification Details / Notes:

Pre Inspection Meeting
Inspection and Test Plan (ITP) Shall be provided for review and approval by Company Inspector.
Material Test Reports (MTR’s) Scraper traps in sour service shall meet NACE MR-01-75/ ISO 15156, MTR’s shall be EN-10204 type 3.1
Weld Procedure Qualification Records, Weld Procedure Specifications and Weld Table Per 02-SAMSS-009, SAES-W-011 and/or W-012 and ASME IX.

Company approval required.

Welder Qualification Records & Repair Rate Tracking Per 02-SAMSS-009, SAES-W-011 and/or W-012 and ASME IX.
Nondestructive Testing Procedures & Personnel Verify valid personnel qualification and approved procedures.

In process inspection & test requirement

Specification Details / Notes:

Components
Reducers, Fittings, Flanges Per 02-SAMSS-009 and PO requirement
Branch connections & Reinforcing pads Per 02-SAMSS-009, Appendix A
Closures Per 02-SAMSS-009
Supports Per 02-SAMSS-009
Vent & Tapped Holes Per 02-SAMSS-009
Materials
Pipe Per 02-SAMSS-009. For sour application, shall be per 01-SAMSS-035
Plate Per 02-SAMSS-009
Fittings and Flanges Per 02-SAMSS-009. Shall be from Aramco approved manufacturers.
Structural steel Per 02-SAMSS-009
Post Weld Heat Treatment (If required) Per 02-SAMSS-009: Shall be performed prior to final NDT.
Guide Bars in Tee Branches 02-SAMSS-009: See Standard Drawing AC-036548.

Final inspection & test requirements

Specification Details / Notes:

Visual & Dimensional Inspection Per 02-SAMSS-009 and approved drawing
Magnetic particle testing Per 02-SAMSS-009. 100% of all welds
RT on Butt Welds (other than weld bosses) Per 02-SAMSS-009. All butt welds. Accepted to ASME VIII, Div.-1, Appendix 4
Quick Opening/Closure Per 02-SAMSS-009
Hydrostatic Test Per 02-SAMSS-009
External/Internal Coating 02-SAMSS-009 & SA-175 Code #091900 and P.O.
Handling After Coating All lifting shall use wide fabric or rubber-covered slings and padding.
Nameplate, Marking and preparation for Shipment Per 02-SAMSS-009

Notes:

  • May only be waived by the responsible Saudi Aramco, ASC, AOC Inspection
  • See form SA175-000003 for instructions on using this

TRAP, SCRAPER: Permanent Scraper Traps | Water or Hydrocarbon Services, Onshore and Offshore

TRAP, SCRAPER: Permanent Scraper Traps | Water or Hydrocarbon Services, Onshore and Offshore

TRAP, SCRAPER: Permanent Scraper Traps | Water or Hydrocarbon Services, Onshore and Offshore

TRAP, SCRAPER: Permanent Scraper Traps | Water or Hydrocarbon Services, Onshore and Offshore

Leave a Reply

Your email address will not be published. Required fields are marked *