This article is about SAES-T-603 which is about Telecommunications Safeguards and Warning Devices and download SAES-T-603 PDF for telecommunication and electrical engineers, supervisors and project managers, telecom QCs, telecom QC Supervisors. This is saudi aramco standards of Telecommunication Engineering based on international codes and standards and useful for telecom and electronics engineering knowledge to get job as engineers, QC Supervisors and QC managers, Engineering managers and technicians.

SAES-T-603 PDF Download

SAES-T-603

Telecommunications Safeguards and Warning Devices

SAES-T-603 standard governs the use of safeguards and warning devices in the construction of telecommunication outside plant (OSP) facilities. Here are some industry codes and standards referenced in the SAES-T-603 standard:

  1. National Fire Protection Association (NFPA):
  • NFPA 329: Underground Leakage of Flammable and Combustible Liquids
  1. American Petroleum Institute (API):
  • API 4149: The Migration of Petroleum Products in Soil and Ground Water
  1. Building Industry Consulting Services International (BICSI):
  • BICSI TDMM: Telecommunications Distribution Methods Manual
  • BICSI OSP: Building Industry Consulting Services International, Outside Plant Reference Manual

These codes and standards provide guidelines and requirements related to various aspects of OSP facilities, including safety, underground leakage, and telecommunications distribution methods. Compliance with these industry standards ensures the proper design and construction of telecommunication OSP facilities and helps maintain safety and operational efficiency.

Removing and Replacing Manhole Covers Safe Working Methods

When removing or replacing manhole covers, the following safety precautions should be taken:

  1. Ensure Proper Safeguards: Before removing manhole covers, make sure that appropriate safeguards and warning devices are in place to adequately protect the location against accidents. Refer to GI-1021.000 for guidance.
  2. Atmospheric Gas Testing and Ventilation: Conduct the prescribed atmospheric gas testing and ventilation of the manhole as described in GI-0002.709, including Supplements 1, 2 & 3, and SAES-T-628.
  3. Use a Standard Manhole Hook: Never attempt to remove a manhole cover without a standard manhole hook. Avoid using large screwdrivers, pickaxes, or crowbars, as many existing manhole covers are non-standard. Non-standard covers should be replaced.
  4. Report Non-Standard Covers: If existing non-standard covers are found at the construction site, report them to the Communication Operations & Maintenance Department for replacement.
  5. Replace Covers Promptly: Never leave an open manhole unattended, even for a short time. Always replace the cover before removing guards and warning devices.
  6. Handle Covers with Care: Manhole covers are heavy and must be handled with care to avoid personal injury. Keep your feet solidly placed and positioned to be clear of the cover in case you drop it.
  7. No Open Flames: Avoid using open flames in or around a manhole or over a manhole cover. The presence of a combustible mixture in the manhole can lead to an explosion.
  8. Avoid Striking Seated Covers: Sparks can be hazardous, so never strike a seated cover directly with a steel or iron implement.

Removing and Replacing Manhole Covers Safe Working Methods.

Additionally, when climbing poles, the following safeguards should be taken:

  1. Visual Check: Conduct a visual check of the pole for any unsafe conditions such as leaning, collision damage, broken or loose wires and guys, or contact with power wires or other equipment on the pole.
  2. Report Unsafe Poles: If a pole is found to be unsafe or suspected of being unsafe to climb or work on, do not climb it and report it to your immediate supervisor. Use a danger sign (Figure 4) to warn against climbing the pole. Place the danger sign below the pole number and facing oncoming traffic.
  3. Warning for Broken Poles: If a pole is broken and requires immediate support, take steps to warn passersby of the hazard.

It is important for personnel climbing or working on poles to review the Construction Safety Manual, specifically Section IV, paragraphs 1.6 and 1.6.11, for further guidance on safety measures and safeguarding work areas underground, buried, and aerial plant.

fAQs about SAES-T-603 PDF Download

Q1: What is SAES-T-603?

A: SAES-T-603 is a Saudi Aramco Engineering Standard that governs the use of safeguards and warning devices in the construction of telecommunication outside plant (OSP) facilities.

Q2: What is the purpose of referencing industry codes and standards in SAES-T-603?

A: Referencing industry codes and standards in SAES-T-603 ensures that the design and construction of telecommunication OSP facilities align with established best practices and safety guidelines. These codes and standards provide valuable insights and requirements to maintain compliance and enhance safety.

Q3: What does NFPA 329 cover?

A: NFPA 329 is a National Fire Protection Association standard that specifically addresses the underground leakage of flammable and combustible liquids. It provides guidelines for identifying, mitigating, and managing potential leakage risks in telecommunication OSP facilities.

Q4: What does API 4149 cover?

A: API 4149 is an American Petroleum Institute standard that focuses on the migration of petroleum products in soil and groundwater. It provides guidance for managing the potential environmental impacts associated with petroleum product migration in telecommunication OSP facilities.

Q5: What are BICSI TDMM and BICSI OSP?

A: BICSI TDMM stands for the Telecommunications Distribution Methods Manual, which provides comprehensive guidelines for the design, installation, and maintenance of telecommunications distribution systems. BICSI OSP refers to the Outside Plant Reference Manual, which offers information and best practices specifically related to outside plant design and construction.

Read Also:

SAES-T-566 PDF Download – Plant Demilitarized Zone (DMZ) Architecture

SAES-T-556 PDF Download – Circuit Quality and Performance

SAES-T-555 PDF Download – IP Based Closed-Circuit Television (CCTV)

SAES-T-521 PDF Download – Circuit Measuring Techniques

SAES-T-494 PDF Download – Very Small Aperture Terminal (VSAT) Network Design

SAES-T-493 PDF Download – Digital Trunked Radio System

SAES-T-492 PDF Download – VHF/UHF Land-Mobile and Fixed Radio Communication

SAES-T-481 PDF Download – In-Plant Voice Paging System

SAES-T-360 PDF Download – Synchronous Digital Hierarchy Transmission Systems

SAES-T-151 PDF Download – D.C. Power Systems

SAES-T-101 PDF Download – Regulated Vendors List for Communications Equipments and Materials

SAES-T-018 PDF Download – Telecommunications Symbols, Abbreviations and Definitions

SAES-T-000 PDF Download – Telecommunications Standards – Introduction and Indices