This article is about Air Cooled Condenser Installation, Design and Technical Specification as per International Codes and standards.
Air Cooled Condenser Installation | Design | Technical Specification
- Condenser units shall be mounted on a concrete housekeeping pad, at a minimum of 100 mm (4″) above the floor or a minimum of 150 mm (6″) above unpaved ground.
- Access doors shall be provided to every valve, coil, filter, damper or mechanical device for inspection and/or adjustment and be within reachable distance
- Air cooled condenser unit shall be mounted level.
- Operational equipment of condensing unit, including solenoid valve, sight glass with cover and cartridge type filter, shall be mounted on a base frame.
- Condenser fan motors, 25 tons and larger units, shall have a separate overload relay protection. This protection shall be in addition to other built-in condenser motor protection devices
- Rooms or spaces other than Refrigeration Machinery Rooms where any refrigerant-containing portion of the condensing unit is located shall be provided with one of the following means of ventilation (UMC Para 1105.7)
1- Permanent gravity ventilation openings of not less than 2 square feet net free area opening directly to the outside of the building or extending to the outside of the building by continues ducts
2-Mechanical exhaust system, discharging it to the outside of the building
Exception:
A- condensing unit in a room or space if the cubical content exceeds 1,000 cubic feet per horsepower of the unit.
B- Condensing unit in a room or space that has permanent gravity ventilation an area of 2 square feet or more to other rooms or openings exceeding 1,000 cubic feet per horsepower. - Refrigeration Systems or portions thereof (Condenser) shall not be located within a required exit enclosure (UMC Para 1105.8)
Standards Codes and References For Air Cooled Condenser Installation
- SAES-K-001 – Heating, Ventilating and Air Conditioning (HVAC).
- SAES-K-100 – Saudi Aramco Mechanical (HVAC) Code
- Uniform Mechanical Code (UMC)
- Uniform Fire Code (UFC), 1997.
- HVAC Passively Cooled Shelter Receiving Insepction
- HVAC Passively Cooled Shelter Installation Inspection
- Commercial Kitchen Hood Installation | Selection | Technical Specification
- Refrigerant Piping Installation | Lay-out | Material | Specification
- HVAC Metal Duct, Hangers and Supports and Insulation Receiving.
- HVAC Chilled Water Piping Lay-out and Support.
- HVAC Condensate Drain Installation | HVAC Engineering.
- HVAC Two Way and Three Way Control Valve Arrangement (Chilled Water Lines).
- HVAC Air Handling Unit (AHU) Installation | HVAC Engineering.
- Chilled Water System Components Receiving, Handling, Storage and Preservation Inspection.
- HVAC Exhaust Fan Receiving, Handling and Preservation.
- HVAC Air Handling Unit (AHU) Receiving, Handling, Storage and Preservation..
- HVAC Duct System Handling, Storage and Preservation.