Battery Room HVAC Technical Requirements | Specification

This article is about Battery Room HVAC Technical Requirements and Specification as per International Codes and standards.

Battery Room HVAC Technical Requirements

  1. Air shall not be recycled from battery rooms
  2. The bottom of the ventilation air inlet into the battery room shall not be higher than 150 mm above the floor.
  3. Air outlet of the battery room shall be located in the ceiling or its upper edge flush with the ceiling if it is located in a wall.
  4. Air inlets and outlets shall be located to provide effective cross ventilation over the batteries
  5. No false ceilings are allowed in battery rooms
  6. Pockets for collection of flammable gas within battery room ceilings shall be avoided.
    Note: If not possible, then means shall be provided to withdraw any collected flammable gas from the highest point within this ceiling pocket”
  7. The Battery Room of the Passively Cooled Communication Shelters shall be provided with a separate passive cooling system to maintain a 37°C maximum indoor air temperature.
  8. The Battery Room of the passively cooled Communication shelters shall not have any ventilation opening that would compromise the effectiveness of the passive cooling system.

Standards Codes and References For Battery Room HVAC Technical Requirements

  1. SAES-K-001 – Heating, Ventilating and Air Conditioning (HVAC).
  2. SAES-K-002 – Air Conditioning Systems for Essential Operating Facilities.
  3. SAES-K-003 – Air Conditioning Systems for Communications Buildings
  4. SAES-K-100 – Saudi Aramco Mechanical (HVAC) Code.
  5. Uniform Mechanical Code (UMC).
  6. Uniform Fire Code (UFC), 1997.
  7. Communication Facilities HVAC Technical Requirements.
  8. Fan Coil Installation | Checklist | Technical Project Specification.
  9. Window Mounted Air Conditioners Installation Receiving, Handling, Preservation.
  10. HVAC Metal Duct, Hangers and Supports and Insulation Receiving.
  11. HVAC Chilled Water Piping Lay-out and Support.
  12. HVAC Condensate Drain Installation | HVAC Engineering.
  13. HVAC Two Way and Three Way Control Valve Arrangement (Chilled Water Lines).
  14. HVAC Air Handling Unit (AHU) Installation | HVAC Engineering.
  15. Air Cooled Condenser Installation | Design | Technical Specification.
  16. Chilled Water System Components Receiving, Handling, Storage and Preservation Inspection.
  17. HVAC Exhaust Fan Receiving, Handling and Preservation.
  18. HVAC Air Handling Unit (AHU) Receiving, Handling, Storage and Preservation..
  19. HVAC Duct System Handling, Storage and Preservation.
  20. Commercial Kitchen Hood Installation | Selection | Technical Specification.

 