1.0 Scope ……………………………………………………….2.0 Building System Format …………………………..Table –I
Special Buildings / Shelters …………………………..
1.0 Scope
This standard outlines the procedure for assigning Building numbers.
This numbering system assigns a unique number to each building in a plant.
2.1 In an existing plant, the assignment of building numbers shall be as per respective
affiliate numbering procedure.
2.2 SABIC E&PM approval shall be required for assignment of any number.
2.0 Numbering System Format
Unit Number: This is two (2) digit number. The assignment of these numbers shall be
as follows:
a) New Plants: EPC contractor shall assign unit numbers to the specific
plant. This numbers shall be from 00 to 99.
b) New Area in Existing Plants: SABIC E & PM will assign the Unit
numbers for Grass root area in existing plant upon request from EPC
contractor.
Building Symbol: This is with maximum of three (3) alpha character code as defined in
Table-I
Sequence Number: This is three (3) digits and shall be sequential starting with 001.
Example : 20-AB-123
TABLE –1
SPECIAL BUILDINGS / SHELTERS
ADMINISTRATION AREA / SHELTERS
AB
Administration Building
AP Admin and Employee Parking
GH
Administration Area Gate House
MO Mosque
SB
Security Building
SHARED FACILITIES (NEAR ADMIN AREA)
CA
Cafeteria
CC
Central Chiller Building
CL
Central Laboratory Building
CR
Change Room
CW Chemical Warehouse
EB
Engineering Building
EG
Emergency Generator Shelter
FS
Fire Station, Medical and Safety Building
MS Main Substation
MT
Maintenance Building
MW Material Warehouse
PG
Main Plant gate House
VM
Vehicle Maintenance Facility
UNIT PROCESS AREA AND PLANT PERIMETER
AD
Additive Building
AS
Analyser Shelters
CB
Control Buildings
DB
EG Drum Filling Building
FC
Polymer Finishing Control and Laboratory
OB Operator Shelters
PC
Polymers Compounding Building
PW Polymers Warehouse
RIB Remote Instrument Buildings
SG
Secondary Gate Houses
TF
Permanent Toilet Facilities
SS
Unit Substations
UM
Unit Maintenance Shop