Commercial HVAC System Complete Inspection and Checklist

This article is about Commercial HVAC System Complete Inspection and Checklist as per International Codes and standards.

Commercial HVAC System Complete Inspection and Checklist

  1. Verify that the Testing Adjusting and balancing (TAB) report has been reviewed and approved by the concerned HVAC maintenance/ operation organization.
  2. Verify that HVAC units automatically shut down when fire alarm system is activated,
  3. Verify that Fire Dampers bear a label from a recognized testing laboratory or tested in accordance with the requirements of UBC STD 43-7 or UL-555.
  4. Verify that filters and strainers used during construction have been cleaned or replaced
  5. Verify that all the quality record documents are available at the construction site
  6. Verify that all the quality record documents are complete
  7. Verify that all the Quality Record document have been reviewed
    Note: Check for all the applicable signatures in various test forms, etc”
  8. All non-conformance reports and worksheets shall have been resolved to the satisfaction of Inspection Department or entered on the MCC Exception Item List and classified as a “No” item.
  9. All Operation and Maintenance (O&M) manuals have been submitted to the Proponent for review four (4) weeks prior to MC.
    Note: Process O&M manuals for facilities must be approved by the Proponent before MC.”

Standards Codes and References For Commercial HVAC System

  1. SAES-K-001 – Heating, Ventilating and Air Conditioning (HVAC).
  2. SAES-K-100 – Saudi Aramco Mechanical (HVAC) Code.
  3. Uniform Mechanical Code (UMC).
  4. Uniform Fire Code (UFC), 1997.
  5. HVAC Passively Cooled Shelter Receiving Insepction.
  6. Fan Coil Receiving, Handling, Storage and Preservation Checklist
  7. HVAC Metal Duct, Hangers and Supports and Insulation Receiving.
  8. HVAC Chilled Water Piping Lay-out and Support.
  9. HVAC Condensate Drain Installation | HVAC Engineering.
  10. HVAC Two Way and Three Way Control Valve Arrangement (Chilled Water Lines).
  11. HVAC Air Handling Unit (AHU) Installation | HVAC Engineering.
  12. Air Cooled Condenser Installation | Design | Technical Specification.
  13. Chilled Water System Components Receiving, Handling, Storage and Preservation Inspection.
  14. HVAC Exhaust Fan Receiving, Handling and Preservation.
  15. HVAC Air Handling Unit (AHU) Receiving, Handling, Storage and Preservation..
  16. HVAC Duct System Handling, Storage and Preservation.
  17. Commercial Kitchen Hood Installation | Selection | Technical Specification.

Leave a Reply

Your email address will not be published. Required fields are marked *