Pre-Fabrication/Production Requirements
|
Specification Details / Notes:
|
Material Test Reports (MTR) |
For cement, sand, iron ore, reinforcing wire, anti-slip, adhesive and polyethylene sheet. |
Pipe Handling Procedure |
01-SAMSS-012 & 01-SAMSS-024: A procedure defining pipe handling shall be submitted to the Buyer’s Representative for approval. |
Inspection and Test Plan (ITP) |
Shall be submitted for review and approval. |
Anode Installation Procedure, Controlled Concrete Curing procedure, Concrete Design Mix |
Shall be submitted for review and approval. |
Mixing Water, sand, iron ore Analysis |
Complete geochemical water analysis shall be submitted for review and approval. |
Applicators, Crew Supervisors & Inspectors Qualification |
Per vendor quality system and SAEP-316 requirements. |
Concrete Weight Coating Application Procedure |
Company approval required. Per P.O and/or applicable Engineering Drawings. |
In process inspection & test requirement
|
Specification Details / Notes:
|
Weight of Externally Corrosion Coated Pipe |
|
External Corrosion Coatings (FBE/Coal Tar Enamel) Inspection Prior to Concrete Coating |
09-SAMSS-089 & 09-SAMSS-068. |
Holiday Testing of External Coatings |
09-SAMSS-089 & 09-SAMSS-068. |
Application of Anti-Slip Adhesive |
|
Mix Proportions |
Vendor to show the proportions as Per approved concrete design mix. |
Application of Concrete Materials |
Per approved application procedure. |
Concrete Sampling |
Vendor shall assign approved third party agency for cylinders sampling. |