TEST AND INSPECTION PER: Purchase Order & Specifications As Noted Below
FITTINGS: Alloy Steel , applicable to low alloy, Stainless Steel and Nickel alloy | INSPECTION & TESTING
Pre-Fabrication/Production Requirements |
Specification Details / Notes: |
Material Test Reports (MTR#s) | |
Heat Treatment Certificates | Per applicable ASTM |
WPS / PQR | For WP-W class fittings only and weld repairs on other classes. |
Welder / Operator Qualification | Per ASME sec. IX. |
NDT Personnel & Procedures | When applicable check for valid qualification of personnel and procedures. |
In process inspection & test requirement |
Specification Details / Notes: |
Nondestructive Testing a) Liquid Penetrant Testing For Bevel Ends | Per ASTM E-165 and ASME sec. VIII, div. 1, appendix 8 and applicable ASTM. |
Nondestructive Testing b) Radiographic Examination | Per applicable ASTM |
Intergranular Corrosion Bend Test | Per applicable ASTM |
Positive Material Identification (PMI) | PMI in accordance with SAES-A-206 when specified by the purchase order |
Final inspection & test requirements |
Specification Details / Notes: |
Visual Inspection | Per applicable ASTM |
Dimensions and Tolerances | Per applicable ASTM ANSI/ASME B16.9, B16.11, B16.28, MSS
SP-43 & SP-79 as applicable. |
Compliance with Purchase Order Description, Specifications, Supplier#sCatalog Description, Certified Drawings, and Paint Specification | Per P.O specifications. |
Marking | Per applicable ASTM, and P.O specifications |
Notes:
- May only be waived by the responsible Saudi Aramco, ASC, AOC Inspection
- See form SA175 -000003 for instructions on using this