Skip to content

FITTINGS: For Use In HOT TAP and/or Stopple Operations; Wet & Sweet Sour Services; Include – Split Tees, Stopple Fittings, Full Encirclement Saddles, Flanges, Lock-O-Ring (LOR) Flanges.

TEST AND INSPECTION PER: 02-SAMSS-006, & Specifications As Noted Below

FITTINGS: For Use In HOT TAP and/or Stopple Operations; Wet & Sweet Sour Services; Include – Split Tees, Stopple Fittings, Full Encirclement Saddles, Flanges, Lock-O-Ring (LOR) Flanges.

Pre-Fabrication/Production Requirements

Specification Details / Notes:

Material Test Reports (MTR#s) 02-SAMSS-006: Includes chemical composition and mechanical testing. The material for the flange shall conform with 02-SAMSS-011
Welder Qualification Records Per ASME Sec. IX.
Welding Procedures Specifications (WPS#s) and Procedure QualificationRecords (PQR#s) Per ASME Sec. IX and 02-SAMSS-006
NDT  Personnel & Procedures Check for valid personnel certification and procedure. RT Film interpreter to meet SAEP-1142 requirements.

In process inspection & test requirement

Specification Details / Notes:

Hardness test Per 02-SAMSS-006
Heat treatment Per 02-SAMSS-006
Nondestructive Testing: Per 02-SAMSS-006
a) Radiographic Testing All butt welds in fabricated fittings shall be 100% radiographed in accordance with ASME VIII Div.1, UW-51.
b) Magnetic Particle Testing 02-SAMSS-006: For full penetration groove welds, in accordance with ASME VIII Div. 1 Appx. 8.
c) Magnetic Particle Testing or Dye Penetrant of Weld Ends for Field Welding 02-SAMSS-006: All butt weld ends shall be tested PT (ASTM E165). Accept/reject to ASME Sec VIII, Div. 1, Appx.8 or MT (ASME Sec. VIII Div. 1 Appx. 8).
d) Ultrasonic Testing of Plates In accordance with ASTM A578, acceptances level C  or equal.
Heat Treatment after Forming and Welding 02-SAMSS-006 and A234 or MSS SP-75: Limitations denoted in SAMSS.
Repair Procedure of Defects Per 02-SAMSS-006. Vendor shall submit details of the repair procedure and nondestructive testing of the repair area for Inspection’s approval prior to making the repair.

Final inspection & test requirements

Specification Details / Notes:

Hydrostatic Tests Per 02-SAMSS-006
Final Visual and dimensional Inspections Per 02-SAMSS-006
Marking Per 02-SAMSS-006
Preparation for Shipping Per 02-SAMSS-006 and  Purchase Order requirement.

Notes:

  • May only be waived by the responsible Saudi Aramco, ASC, AOC Inspection
  • See form SA175 – 000003 for instructions on using this

FITTINGS: For Use In HOT TAP and/or Stopple Operations; Wet & Sweet Sour Services; Include - Split Tees, Stopple Fittings, Full Encirclement Saddles, Flanges, Lock-O-Ring (LOR) Flanges.

FITTINGS: For Use In HOT TAP and/or Stopple Operations; Wet & Sweet Sour Services; Include - Split Tees, Stopple Fittings, Full Encirclement Saddles, Flanges, Lock-O-Ring (LOR) Flanges.

FITTINGS: For Use In HOT TAP and/or Stopple Operations; Wet & Sweet Sour Services; Include - Split Tees, Stopple Fittings, Full Encirclement Saddles, Flanges, Lock-O-Ring (LOR) Flanges.

Leave a Reply

Your email address will not be published. Required fields are marked *