1 Purpose ……………………………………………………………………………………2 References ……………………………………………………………………………………3 Addenda ……………………………………………………………………………………Section 1- Introduction ……………………………………………………….1.2 Scope ……………………………………………………………………………………Section 2 – References ……………………………………………………….2.1 Substitute the following PIP’s with SES’s …………………………..Section 4 – Basic Design ……………………………………………………….4.1 General ……………………………………………………………………………………4.7 Shaft Sealing Systems ……………………….. 5 – Accessories ……………………………………………………….5.1 Drivers ……………………………………………………………………………………5.2 Coupling and Guard ……………………………………………………….5.3 Baseplates …………………………………………………………………………………..Section 6 – Inspection, Testing and Preparation for shipment………………………..Revision History……………………………………………………………………
1 Purpose
Process Industry Practice PIP # RES P003 H is adopted as a SABIC Engineering Standard
with the following addendum.
2 References
Reference is made in this addendum to the following documents. The latest issues,
amendments and supplements of these documents shall apply unless otherwise indicated.
SABIC Engineering Standards (SES)
E02-G01 Electrical Design Criteria
E06-S01 Induction Motors 150 kW (200 HP) and Below
E06-S02 Induction Motors 185 kW (250HP) and above
G01-S03 Horizontal End Suction Centrifugal Pumps for Chemical Process
G01-S04 Design of ASME B73.1 and General Purpose Pump Baseplates
S20-G01 Plant Equipment Noise Levels
G06-S01 General Purpose Steam Turbines
G07-S01 General Purpose Gear Units
G10-S01 Diesel Engines
3 Addenda
The following section, subsection and paragraph numbers refer to PIP RES P003H, October
1997.
Section 1- Introduction
1.2 Scope
1.2.2 Service Conditions
Modify the sentences as follows:
c. Change Maximum pumping temperature to 120°C (248°F)
e. Add Maximum Power 750 Kw (1000 HP)
Modify the last paragraph as follows:
For water services outside these conditions, the pumps shall conform to SES
G01-S06 (which is SABIC’s exceptions and additions to API 610).
1.3 Add the following new paragraphs.
1.3.1 This specification supplements the data sheets on which the operating
conditions and special requirements are listed in detail for each individual
pump.
1.3.2 Compliance with this specification does not relieve pump supplier of the
responsibility of furnishing pumps and accessories of proper design,
mechanically suited to meet operating at the specified service conditions. Nor
does it relieve pump supplier of the responsibility of furnishing equipment
assembled and prepared for shipment in a professional manner.
1.3.3 Vendors qualified by experience manufacturing the proposed units shall
supply pumps. To qualify, the Vendor shall have manufactured at least two
(2) pumps of comparable size, model, power rating, and speed in similar
service as indicated in the individual specification and data sheets. These
pumps shall have completed at least 8000 hours of continuous operation
satisfactorily.
1.3.4 Unless otherwise specified, the vendor shall assume unit responsibility for all
equipment and all auxiliary systems included in the scope of the order.
Section 2 – References
2.1 Substitute the following PIP’s with SES’s
PIP RES P002 with SES G01-S04 ‘Design of ASME B73.1 and General Purpose
Pump Baseplates’ PIP RES P73H with SES G01-S03 ‘Horizontal End Section
Centrifugal Pumps for Chemical Process’
Section 4 – Basic Design
4.1 General
4.1.2 Add the following new paragraph:
Equipment covered in this specification shall be designed to operate in the
conditions stated on the data sheets. Unless otherwise specified, the
maximum sound levels shall be 85 dBA at 1 meter from the equipment
surface.
4.5 Impellers
Modify as follows:
Solid hubs on impellers are required. Impellers made from a cored hub shall require
SABIC approval.
Section 5 – Accessories
5.1 Drivers
5.2.2 Add the following new paragraph:
a. Electric motor drivers shall conform to SES E06-S01 or E06-S02 as
applicable
b. Steam turbine drivers shall conform to SES E06-S01
c. Diesel Engine drivers shall conform to SES G10-S01
d. Gears shall conform to SES G07-S01
5.2 Coupling and Guard
5.2.2 Add the following sentence:
Unless otherwise specified, non-Lubricated disk-pack or diaphragm type
spacer couplings shall be furnished.
5.3 Baseplates
Substitute PIP RES P002 with SES G01-S04.
Section 6 – Inspection, Testing and Preparation for shipment.
6.1.1 Modify the paragraph as follows:
Requirements for inspection, testing, witnessing or observing shall be as
specified on the pump data sheets.
6.1.6 Add the following new paragraph:
All tests whether witnessed or not, shall be certified by the vendor.