This article is about HVAC Passively Cooled Shelter Installation Inspection as per International Codes and standards.
HVAC Passively Cooled Shelter Installation Inspection
- Passively cooled shelter shall be installed at the location indicated on the construction drawings.
- Passively Cooled Shelter shall be provided with Chart Recorder, recording the indoor air temperature.
- The Battery Room of the Passively Cooled Communication Shelters shall be provided with a separate passive cooling system to maintain a 37°C maximum indoor air temperature.
- The Battery Room shall not have any ventilation opening that would compromise the effectiveness of the passive cooling system.
- The Chart Recorder shall have the capability of continuously recording for a minimum duration of 28 days.
- The temperature measurements shall be performed 1.5 m above the floor and 0.4 m in front of the equipment.
Standards Codes and References For HVAC Passively Cooled Shelter Installation Inspection
- SAES-K-001 — Heating, Ventilating and Air Conditioning (HVAC).
- SAES-K-100 — Saudi Aramco Mechanical (HVAC) Code.
- SAES-K-003 — Air Conditioning Systems For Communications Building.
- Uniform Mechanical Code (UMC).
- Uniform Fire Code (UFC), 1997.
- HVAC Metal Duct, Hangers and Supports and Insulation Receiving.
- HVAC Chilled Water Piping Lay-out and Support.
- HVAC Condensate Drain Installation | HVAC Engineering.
- HVAC Two Way and Three Way Control Valve Arrangement (Chilled Water Lines).
- HVAC Air Handling Unit (AHU) Installation | HVAC Engineering.
- Chilled Water System Components Receiving, Handling, Storage and Preservation Inspection.
- HVAC Exhaust Fan Receiving, Handling and Preservation.
- HVAC Air Handling Unit (AHU) Receiving, Handling, Storage and Preservation..
- HVAC Duct System Handling, Storage and Preservation.