HVAC Supervisor Interview Questions and Answers

This article is about HVAC Supervisor Interview Questions and Answers specially for Saudi Aramco Projects. These questions are asked normally in CBT ARAMCO Test of HVAC Discipline and for HVAC Engineers and QCs

HVAC Supervisor Interview Questions and Answers

51. Color code for identification of portable water line is

a. Yellow back ground with black lettering b. Black back ground with yellow lettering

c.  Green back ground with white lettering   d. White back ground with green lettering e. None of the above

52. Strip left at the joining of duct and machine.

a. Duct end b. Collar Length c.   Bending Length   d. Joint Length e. None of the above

53. Is this nominal capacity equal in every country?
a. Yes b. No c. None of the above d. 0

54. What is the maximum allowable length of a flexible duct?

a.    1.5M                                                                                   b.    2M

c.    1                                                                                          d.    2.5M

e.    None of the above

55. Pipe stored on racks or bearing board the support will be at least……………

a.    75mm Wide         b.    90mm Wide c.       100mm Wide                                                                    d.    60mm Wide e.    None of the above

56. Forced main sizing shall be based on a minimum flow of velocity of……….

a.    0.8 m per sec                  b.    0.9 m per sec c.   1.2 m per sec                                                                      d.    1m per sec e.    None of the above

57. Collars and sleeves shall be inserted into flexible duct a minimum of …………….before fastening.

a.    50 mm                       b.    40 mm c.       32mm              d.    25 mm e.    None of the above

58. Flexible air ducts have rectangular UL labels attached every ……………………..

a.    3.50 m         b.    1.5 m c.    3.05 m      d.    2.00 m e.    None of the above

59. Average slope of ground in the drainage area in meter per …….

a.    300mm         b.    305mm c.   400mm        d.    450mm e.    None of the above

60. The minimum vent size shall be ………..

a.    50 mm         b.    56 mm OD c.    32mm           d.    40 mm OD e.    None of the above

61. Which of the following materials are approved for water piping system?

a.    Brass             b.    Copper c.  Galvanized steel        d.    asbestos-cement e.    All the above

62. Maximum height of decorative block wall enclosures for lift stations near residential areas

a. 1.5 mts b. 2 mts c.   2.5 mts   d. 3 mts e. Prohibited in residential areas

63. Duct access door shall be a minimum of …………

a. 200mm x 200mm b. 150 x 150 mm c.   200mm x 150mm   d. 300mm x 300mm e. None of the above

64. Shower head  will not exceed a water supply flow rate of ………………. per minute.

a.    3.5 liters          b.    6.5 liters c.   9.5 liters              d.    10.5 liters e.    None of the above

65. What is the minimum condensate drain piping required for HVAC equipment over 20TR to 40TR?

a.    32mm             b.    38mm c.       51mm         d.    25mm e.    None of the above

66. The smoke dampers shall be installed in a maximium……….distance from the smoke barrier

a.    460mm         b.    700mm c.    610mm       d.    820mm e.    None of the above

67. Connectors are more restricted and are currently limited to 14 in. (4.27 m) of installed length.

a.    4.27 m         b.    4.00 m c. 3.27 m       d.    2.27 m e.    None of the above

68. Continuous Waste – A drain connecting the compartments of a set of fixtures to a trap or connecting other permitted fixtures to a common trap

a.    Industrial Waste        b.    Domestic Waste c.    Sewage Waste                   d.    Continuous Waste

e.    None of the above

69. What is CFM ?

a.    Centerlized Fan motor      b.    Controlled Fan Module c.  Cubic Feet Meter         d.    None of the above

70. How much design velocity required in the main duct of an office building?

a.    800-1100 FPM                                                                  b.    900-1100 FPM

c.    900-1300 FPM                                                                  d.    950-1050 FPM

e.    None of the above

71. What is the appliance receiving, conditioning and delivering air supplied through an air distribution system?

a.    Fan Coil Unit        b.    Air Terminal Unit c.       Air Filter                     d.    Air Foil

e.    None of the above

72. If loose pipes are stacked on each other the stack height shall be not exceed of……..

a.   1m            b.    1.5m c.  1.2m          d.  1.1m e.    None of the above

73. Sub lateral shall have a minimum nominal pipe diameter of……….

a.    200mm           b.    150mm c.    240mm          d.    100mm e.    None of the above

74. Drains that have not been backfilled shall be period of………

a.    4 hrs             b.    24 hrs c.   16 hrs          d.    8 hrs e.    None of the above

75. The maximum distance between manhole for public sewer shall be……..

a.    90M                                                                                    b.    120M

c.    60mm                                                                                 d.    200M

e.    None of the above

76. Minimum size of the letter for identification on 10 inch pipe is

a.    3 inches       b.    2 ½ inches c.    3 ½ inches        d.    4 ½ inches e.    None of the above

77. Cross-linked polyethylene/aluminum/cross-linked polyethylene (PEX-AL-PEX) pipe is approved as per which standard

a.    ASTM F 1281       b.     ASTM F 1282 c.  ASTM A 53             d.    ASTM A 312 e.    ASTM A 778

78. Duct access door shall be a maximum of ……

a.    610mm x 610 mm      b.    610mmmx450mm c.    450mm x 450mm      d.  800mm x 600mm

e.    None of the above

79. The rain leader from the roof to the building storm drain, combined building sewer, or other means of disposal located outside of the building IS ?

a.    Roof Grating                                                                     b.    Scupper

c.    Downspout                                                                       d.    Roof Drain e.    None of the above

80. Any pressure less than that exerted by the atmosphere is ??

a. Vacuum Breaker b. Vacuum c.   Back Flow   d. Back Pressure e. None of the above

81. Hangers shall be placed on the coupling.

a. TRUE b. FALSE c.  None of the above d. 0

82. Blow out all line with …………..  prior to testing and charging

a.    Wet Air       b.    Dry Nitrogen c.       Dry Air       d.    Hot Air e.    None of the above

83. The lip drain funnel shall be elevated above the ground of……

a. 80mm b. 70mm c. 50mm d. 120mm   e.   None of the above

84. Minimum distance between two fixtures is

a. 25 inches b. 30 inches c. 15 inches   d. 20 inches   e. None of the above

85. Retaining angles must overlap structure opening 1 inch minimum and cover cor- ners of openings

a. 1 inch       b.  2 inch c. 1.5 inch          d.    3 inch e.    None of the above

86. What is the Room Temperature that YOU maintain in any room?

a.    24C b.   28C c.    26C              d.    18C e.    None of the above

87. Which gas is used to purge the refrigerant line during the brazing?

a.    Argon        b.    Mythel c. nitrogen     d.    inert gas e.    None of the above

88. What device shall be provided at the or close to the highest elevation within the chilled water system?

a.    Automatic Air vent      b.  Mixing plenum Box c.    Turning Vanes    d.    Dampers e.    None of the above

89. Such funnels shall be located within the sealed manhole or within the drainage are……..

a.    15m       b.    12m c.    14m            d.    10m e.    None of the above

90. Pipe and  pipe fitting, trap, fixture, material, and device used in a plumbing system shall have cast, stamped, or indelibly marked on….. ………

a.   Each One    b.  Randomly c.  Minimum 5 in bundle       d.  Minimum 2 in bundle e. None of the above

91. Support to be provided at alternate horizontal branch connection.

a. TRUE b. FALSE c.  None of the above d. 0

92. The vent shall be water tight for period of ………

a. 4 hrs b. 24 hrs c. 16 hrs d. 8 hrs   e.   None of the above

93. Support adjacent to joint, not to exceed ………………

a. 350mm b. 300mm c. 457 mm d. 400mm e.   None of the above

94. Volume dampers shall be located minimum of ……. Duct sizes away from thefittings

a. Three     b.    Two c. One           d.    Four e.    None of the above

95. The horizontal between drain opening and catch basin or the manhole shall not exceed…

a.   15meter         b.  12meter c.  14meter        d.  10meter e.  None of the above

96. Which of the following fixture should not equipped with strainers?

a.   Bath tub      b.  Water closet c.  Wash basin            d. Kitchen sink e. None of the above

97. Which is intended to restrict the spread of smoke in HVAC systems that are designed to be automatically shut down in the event of fire ?

a. Smoke dampers b. Fire dampers c. Leakage Rated Dampers d. Ceiling Dampers

a. Smoke dampers b. Fire dampers c. Leakage Rated Dampers d. Ceiling Dampers e.   None of the above

98. What is ASHRAE?

a.  Association of Heating Refrigeration and Air- conditioning Engineers                                                   

b. American Society of Heating Refrigeration and Air-conditioning Engineers

c.  American Society of Heating and Refrigeration Engineers                                                       

d. American Society of Heater and Air-conditioning Engineers

e. None of the above

99.  At what temperature degree Ferhenite & degree Celsius are same?

a.    400C             b.    ─400C c.    ─450C          d.    ─350C e.    None of the above

100. Blow out all line with …………..  prior to testing and charging

a.    Wet Air           b.    Dry Nitrogen c.    Dry Air         d.    Hot Air e.    None of the above

Answers:

51C
52B
53A
54A
55A
56B
57D
58C
59B
60C
61E
62D
63B
64C
65D
66C
67A
68D
69C
70B
71B
72B
73A
74A
75A
76C
77A
78A
79C
80B
81B
82C
83A
84B
85A
86A
87C
88A
89A
90A
91B
92A
93C
94B
95B
96B
97C
98B
99B
100C

For More QC Knowledge Please Read QC CBT and Interview Preparation.