TEST AND INSPECTION PER: 34-SAMSS-511and Specifications As Noted Below.
Inspection & Testing of Chromatographs Process Gas
Pre-Fabrication/Production Requirements | Specification Details / Notes: |
In process inspection & test requirement | Specification Details / Notes: |
Final inspection & test requirements | Specification Details / Notes: |
Information Package | Documentation per 34-SAMSS-511. |
Verification of Analyzer Calibration | Samples shall represent full scale and zero values of the measured component/s. |
Eight (8) Hour Uninterrupted Run Test | Shall use an upscale sample with a record made available. |
Radiated Magnetic Field Test | Per IEC 801-3, level 3. Test may be conducted with the cabinet door/s closed. |
Identification and Tagging | As per 34-SAMSS-511. |
Notes:
- May only be waived by the responsible Saudi Aramco, ASC, AOC Inspection
- See form SA175-000003 for instructions on using this