Skip to content

Page Party Station Indoor Materials Receiving Inspection of P.A System

This article is about Page Party Station Indoor Materials Receiving Inspection Points of Public address system for international industrial projects including ARAMCO Projects. This article is related to Telecom QC Inspectors, Engineers, Designers and Technicians.

Page Party Station Indoor Materials Receiving Inspection

  1. Verify that all materials received have been inspected for damage and compliance to applicable requirements.
  2. Check that the equipment storage and protection is according to the manufacturer’s recommendations.
  3. Confirm that the equipment and components received meet the project Purchase Order specifications and all applicable requirements, standards, and specifications.
  4. Ensure that the electrical equipment complies with the National Electrical Code and meets the criteria in the SAES-B-055 and SAES-B-068 for classified areas.
  5. Make sure the received materials are new and unused.
  6. Verify that the material and accessories are in agreement with the Saudi Aramco-approved project-specific design drawings, diagrams, schedules, lists, databases, and design documents.
  7. Ensure that an equipment and material identification system is implemented for the received items.
  8. Ensure that the equipment and accessories can be traced from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification, and use.

REFERENCE DOCUMENTS:

  1. Schedule G — Material, Tools and Equipment
  2. Schedule Q — Quality Requirements
  3. SAES-T-481. Powered In-Plant Communications
  4. SAIC-T-5204

Leave a Reply

Your email address will not be published. Required fields are marked *