This article is about Refrigerant Piping Installation, Lay-out, Material and Specification as per International Codes and standards.
Refrigerant Piping Installation | Lay-out | Material | Specification
- Soldered joints shall not be used for piping containing other than Group “”A1″” refrigerant or any other toxic or flammable fluid.
(ANSI B-31.5 Para 517 a)
Note: See attachment No. 1 for Group “” A1″” refrigerant” - All Refrigerant line shall be purged with 7 Kpa gauge (1.0 psig) dry nitrogen while soldering, brazing or welding connections.
- Refrigerant piping placed underground shall be protected against corrosion. (UMC Para 1110.6)
Note: Method for protection shall be reviewed and approved by Saudi Aramco” - Supports for refrigeration piping shall be noncombustible. (UMC Para 1105.2)”
- Refrigerant piping and tubing shall be securely fastened to a permanent support within 6 feet (1.8 m) following the first bend in such tubing from the compressor and within 2 feet (610 mm) of each subsequent bend or angle. (UMC Para 1110.3)
- Refrigerant piping and tubing shall be supported at points not more than 15 feet (4570 mm) apart. (UMC Para 1110.3)
- Soft annealed copper tubing shall not be larger than 1-3/8 inch (34.9 mm) nominal size. (UMC Para 1110.3)
- Soft annealed copper tubing conveying refrigerant shall be enclosed in iron or steel piping and fittings or conduits. (UMC Para 1110.3)
- Refrigerant piping shall not be located within a required exit. (UMC Para 1110.5)
- Refrigerant suction lines shall be insulated from the evaporated to the compressor.
- The type of refrigerant, function and pressure shall be indicated on refrigerant piping (UMC Para 1110.8)
- Insulation of Insulated refrigerant lines installed outdoors shall be protected from moisture and sunlight degradation by an approved and acceptable method
Note: The most commonly used protection used in Saudi Aramco projects is Aluminum Cladding.
Standards Codes and References For Refrigerant Piping Installation | Lay-out | Material | Specification
- SAES-K-001 — Heating, Ventilating and Air Conditioning (HVAC).
- 2-SAES-K-100 — Saudi Aramco Mechanical (HVAC) Code
- Uniform Mechanical Code (UMC)
- Uniform Fire Code (UFC), 1997.
- HVAC Metal Duct, Hangers and Supports and Insulation Receiving.
- HVAC Chilled Water Piping Lay-out and Support.
- HVAC Condensate Drain Installation | HVAC Engineering.
- HVAC Two Way and Three Way Control Valve Arrangement (Chilled Water Lines).
- HVAC Air Handling Unit (AHU) Installation | HVAC Engineering.
- Chilled Water System Components Receiving, Handling, Storage and Preservation Inspection.
- HVAC Exhaust Fan Receiving, Handling and Preservation.
- HVAC Air Handling Unit (AHU) Receiving, Handling, Storage and Preservation..
- HVAC Duct System Handling, Storage and Preservation.