Skip to content

SCADA Inspection and Testing for ARAMCO Projects

Saudi Aramco is committed to providing the best possible SCADA systems for its operations. With this in mind, the company has established a set of requirements for inspection and testing of integrated systems. All system components must adhere to Saudi Aramco Inspection Requirements Form 175-230200.

To ensure the quality of these systems, vendors must conduct Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT). For the FAT, vendors must develop their own criteria and submit it for Saudi Aramco’s approval.

Additionally, they must provide a list of the necessary test tools. For the SAT, vendors must develop their own criteria and have it approved by Saudi Aramco. Both tests must adhere to the requirements of SAEP-1634 Factory Acceptance Test and SAEP-1638 Site Acceptance Test Plan.

Furthermore, the system must be designed in such a way that users can maintain the system with minimal reliance on vendor services. The system must also include all the necessary software for configuration and maintenance of the database. By adhering to these requirements, vendors can ensure the best possible SCADA systems for Saudi Aramco’s operations.

Read More Related Articles:

  1. Introduction to SCADA (Supervisory Control and Data Acquisition) System | PDFBAG
  2. International Code & Standard References Used in SCADA Projects | PDFBAG
  3. SCADA System Terms and Definitions used for Engineers | PDFBAG
  4. SCADA System Design Technical Requirements | PDFBAG
  5. SCADA Data Acquisition and Processing | PDFBAG
  6. Ensuring Optimal System Performance for SCADA Systems | PDFBAG
  7. Best Practices for Telecommunications in SCADA Systems | PDFBAG
  8. Requirements for SCADA Network and Corporate Network Interface | PDFBAG
  9. SCADA Display Design Philosophy | PDFBAG
  10. SCADA Security And System Access Technical Requirements | PDFBAG
  11. Instrument Asset Management System (IAMS) for SCADA System | PDFBAG
  12. Environmental Conditions Technical Requirements for SCADA | PDFBAG
  13. RTU Cabinet Requirements for SCADA System | PDFBAG
  14. Wiring and Power Supply Technical Requirement for SCADA | PDFBAG

Leave a Reply

Your email address will not be published. Required fields are marked *