TEST AND INSPECTION PER: 01-SAMSS 047 and applicable ASTM standard.
TUBES: Stainless steel and Nickel alloy tubes | INSPECTION & TESTING
Pre-Fabrication/Production Requirements |
Specification Details / Notes: |
Pre Inspection meeting | |
Material Test Reports | Applicable ASTM |
Welding procedure specification(WPS) and Procedure Qualification Records (PQR) | Per 01-SAMSS-047 |
Raw Material Verification | Per ASTM & 01-SAMSS-047 Para 6.8 |
NDT Personnel and Procedure | Per 01-SAMSS-047, verify qualification per ASNT CP-189/EN 473/ASNT SNT TC-1A or equivalent and applicable ASTM. |
In process inspection & test requirement |
Specification Details / Notes: |
Workmanship, components and Dimensions | As per applicable ASTM |
Chemical Composition | Per 01-SAMSS-047 and applicable ASTM. |
Tensile Test | Per applicable ASTM |
Hardness Test | Per 01-SAMSS-047 |
Flattening, flaring, flange test | Per applicable ASTM |
Corrosion test | Per 01-SAMSS-047 table 4 |
Metallographic Examination | Per 01-SAMSS-047 |
Heat treatment | Per 01-SAMSS-047 and applicable ASTM std. |
Pressure testing | Per 01-SAMSS-047 para13.6 |
Nondestructive testing | Per 01-SAMSS-047 and applicable ASTM |
Positive material identification | Per 01-SAMSS-047 |
Pickling and passivation | Per 01-SAMSS-047 |
Final inspection & test requirements |
Specification Details / Notes: |
Visual and dimensional inspection | Per 01-SAMSS-047 and applicable ASTM std. |
Marking | Per 01-SAMSS-047 and applicable ASTM std. |
Handling, Packing and Transportation | Per 01-SAMSS-047 |
Certification | Per 01-SAMSS-047 and applicable ASTM std |
Notes:
(1)May only be waived by the responsible Saudi Aramco, ASC, AOC Inspection Offices. (2)See form SA175 – 000003 for instructions on using this form.