TEST AND INSPECTION PER: SA-175 043000
VALVE: Low severity, utilities service in cast iron or ductile iron and non-ferrous material | INSPECTION & TESTING
Pre-Fabrication/Production Requirements |
Specification Details / Notes: |
In process inspection & test requirement |
Specification Details / Notes: |
Final inspection & test requirements |
Specification Details / Notes: |
Pressure Testing of valves | Per manufacturer requirements. |
Drawing and Test Certificate. | Certificate of conformity must include testing and material requirements. (see note 2) |
Notes:
- See form SA175 – 000003 for instructions on using this
- Inspector shall review approved drawing, MTC, coating report including cure and adhesion