TEST AND INSPECTION PER: 02-SAMSS-005, ASTM A420, ASTM A860 & Specifications As Noted Below
PIPE COMPONENTS: Low Temperature Service, Wrought Carbon Steel and Alloy Steel; Seamless & Welded Construction
Pre-Fabrication/Production Requirements |
Specification Details / Notes: |
| Material Test Reports (MTR’s) | 02-SAMSS-005 & ASTM A420: See SAMSS for material requirements. |
| Welder Qualification Records | |
| Welding Procedures Specifications (WPS) and Procedure Qualification Records (PQR) | Per SAEP 352. |
| NDT Procedures and Personnel | Verify valid personnel qualification and procedures. |
In process inspection & test requirement |
Specification Details / Notes: |
| Forging operation/process | One per PO line item |
| Mechanical Testing: | |
| a) Tensile Test for Fitting Material, Charpy Impact test, Hardness test | Per 02-SAMSS-005, ASTM A420 & A370. |
| b) Transverse Weld Tensile Test (welded fittings only) | Per 02-SAMSS-005 & ASTM A420. |
| Nondestructive Testing: | |
| a) Magnetic Particle Testing or Dye Penetrant | All butt weld ends shall be tested using either PT (per ASTM E165) or MT (per ASME SEC VIII D1, Appendix 8). |
| b) Radiographic Testing (welded fittings only) | All welds in fabricated fittings shall be 100% radiographed in accordance with ASME Sec VIII, D1, Paragraph UW-51. |
| c) Ultrasonic Testing (welded fittings only) | 02-SAMSS-005 & ASTM A420: Plate used to mfg. fittings shall be examined for laminations. |
| Heat Treatment after Forming and Welding | 02-SAMSS-005 & A420: Limitations denoted in SAMSS. |
Final inspection & test requirements |
Specification Details / Notes: |
| Visual Inspection (surface quality) and Dimensional Check | Per 02-SAMSS-005 & A420. Other dimensions as sp in ASME B-16.9 or MSS SP-75 as appl. Any further exceptions shall be stated in the PO. |
| PMI requirement | Per SAES-A-206 and SA-175 form 320300. |
| Product Marking | 02-SAMSS-005 & ASTM A420. |
| Weld End Coating & Protection | |
| Paint Coating | Coating shall not take place until visual / dimensional inspection completed. |
| Final Packaging | Only if specified in P.O. |