Skip to content

INSPECTION & TESTING

Cement Lined Ductile Iron Pipe & Fittings for Internal Surfaces

Cement Lined Ductile Iron Pipe & Fittings for Internal Surfaces

This article is about Inspection and Testing of Concrete Mortar Lining for Internal Surfaces of Line Piping and Fittings. More you will find about cement lined ductile iron pipe and cement lining pipe Procedure.

Cement Lined Ductile Iron Pipe & Fittings for Internal Surfaces

what is cement lined ductile iron pipe / Cement Mortar Lining?

Cement lined ductile iron pipe is essentially the same as cement mortar lining. Both terms refer to the process of applying a cement mortar lining to the interior surface of a ductile iron pipe.

A cement mortar liner refers to a protective coating or lining applied to the internal surfaces of steel pipes to provide corrosion resistance and improve the longevity of the pipe. It involves the application of a cement mortar material, which is a mixture of cement, sand, and water, to create a smooth and durable lining on the inside of the pipe.

The cement mortar liner serves as a barrier between the pipe and the transported fluids, preventing corrosion and minimizing the risk of leaks or damage. It is commonly used in various industries, including water supply, sewage systems, and oil and gas pipelines, where the protection of steel pipes against corrosion is crucial.

The cement mortar liner is applied through a specialized process that includes surface preparation, application of the mortar mixture, and curing. The thickness of the liner can vary depending on the specific requirements and conditions of the pipeline. The liner enhances the structural integrity of the pipe and helps to maintain the quality and efficiency of fluid transportation.

How to Perform Inspection cement lined ductile iron pipe?

TEST AND INSPECTION PER: 01-SAMSS-005, and Specifications As Noted Below. Following Is Procedure Related To Inspection And Testing Of Concrete Mortar Lining For Internal Surfaces Of Line Pipe And Fittings.

Pre-Fabrication/Production RequirementsSpecification Details / Notes:
Quality Program ProcedurePer 01-SAMSS-005 Sec IV
Material receiving & Handling01-SAMSS-005, 01-SAMSS-024, & AWWA C205. Random sampling for verification and suitability.
Reinforcement Wire, Portland cement and Curing compound.01-SAMSS-005 & AWWA C205.
In process inspection & test requirementSpecification Details / Notes:
Mixing ratio/ slump test01-SAMSS-005 & AWWA C205
Mortar Testing : Sand, Water and Cement MortarPer 01-SAMSS-005 Table 1. To be performed before and during lining operations. Frequency can increase as determined by the COMPANY.
Surface Preparation01-SAMSS-005 & SIS-05-59-00: Cleaned in accordance with St2.
Thickness01-SAMSS-005 & AWWA C205.
Mortar Lining Test Cylinders01-SAMSS-005 & AWWA C205.
Final inspection & test requirementsSpecification Details / Notes:
General Visual inspection, End cap and Curing process01-SAMSS-005 & AWWA C205.
Handling, Loading & Stacking01-SAMSS-005 01-SAMSS-024, & AWWA C205
Cement Mortar Lining Inspection Procedure

Notes:

  • May only be waived by the responsible Saudi Aramco, ASC, or AOC Inspection
  • See form SA-175 form (000003) for instructions on using this
 CONCRETE MORTAR LINING: For Internal Surfaces of Line Pipe and Fittings |  INSPECTION & TESTING
Read More »Cement Lined Ductile Iron Pipe & Fittings for Internal Surfaces